Well Pak Tec 5 gallon water filling machine

Home » Products » Well Pak Tec 5 gallon water filling machine

Well Pak Tec 5 gallon water filling machine

Categories:
Inquire

Description

Product Description

General description

QGF automatic barrel filling machine is exclusively used in producing 3/5 gallon barrel water.
The production line can do automatically washing, sterilizing, filling, capping, barrel-out, with a good appearance, easy operate, low-loss energy & save water, high working efficiency. The frame of the machine is welded by 38*38 stainless steel square tube, with the characteristic of high intensity, good rigidity, light weight, aesthetic appearance, easy washing etc.

Main features

  • Implementing agencies is completed by the pneumatic system of automatic control procedure, automatic line detection, to achieve full automation;
  • No bottle no washing, no bottle no filling, no bottle no capping with change clock pulse to control filling accuracy;
  • Only change some change part, this machine can filling 3 gallon barrel. (User should supply 3 gallon sample barrel);
  • The spraying nozzles of this machine import technology of USA spraying company, promoting spraying;
  • Adopting new type filling valve, prevent filling overflow;
  • Side-flow water channel, side-flow water tank, making it easy to clean the machine.

Technical parameters

1) Output capacity: 450barrels/h
2) Barrel type: Φ56×Φ270×490 mm
3) Max. Water consumption: mineral water/purified water 12.8T/h, with filling 9T/h, washing 3.8T/h.
Washing process and time:

  • Sterilize water inner rinsing 40s/barrel (two step)
  • Water drip & drain 20s (one step)
  • Cycle water inner rinsing outer spraying 40s (one step)
  • Water drip & drain 20s (one step)
  • Sterilize water inner rinsing 40s (two step)
  • Sterile water inner rinsing 40s (one step)
  • Water drip & drain 40s/barrel (one step)

4) Overall dimension: 5700×2150×1800mm
5) Power:6.5kw
6) Weight: about 2100 KG

Preduct Display

About Company

Zhangjiagang Well Pak Machinery Co., LTD., located in China’s “golden waterway”, at the southern bank of the middle and lower reaches of the Yangtze river in Zhangjiagang city, Jiangsu province. She is surrounded by Shanghai, Nanjing, Suzhou, Wuxi and other cities ring. Well is the collection research, manufacturing, service as one of the beverage machinery professional manufacturers. Well puts the main energy into professional technology domain- beverage packaging machinery, upstream and downstream related both beverage packaging equipment research and development. Well aims at the world’s most advanced beverage packaging machinery technology, combined with domestic and foreign advanced beverage packaging machinery technology, adhering to the technical service the customer’s idea, to conduct a comprehensive development research, products has great market competitive advantage.

RFQ

Q1: Do you have reference project?
A1: We have reference project in most countries,If we get the permission of the customer who has brought the machines from us ,we can tell you their contact imformation,you can go to vist their factory. And you are always welcome to come to visit our company,and see the machine running in our factory,we can pick you up from the station near our city. Contact our sales people you can get video of our reference running machine

Q2: Do you have agent and after-service stations?
A2: So far we have agent in Yemen,Nigeria,Dubai,India,Kenya,Dubai welcome to join us!

Q3: Do you provide customized service?
A3: We can design the machines according your requirements(materil ,power,filling type,the kinds of the bottles,and so on),at the same time we will give you our professional suggestion,as you know,we have been in this industry for many years.

Q4: What’s your guarantee or the warranty of the quality if we buy your machines?
A4: We offer you high quality machines with 1 year guarantee and supply life-long technical support.

Q5: How long time for installation?
A5: According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.

Customers Who Bought This Item Also Bought

Title

Go to Top