Automatic CSD soft drink can filling machine

Home » Products » Automatic CSD soft drink can filling machine

Automatic CSD soft drink can filling machine

Model:DYGF20-4

Speed:9000CPH

Filling Way:Isobaric Filling

Filling Material: Beer, CSD anf Soft Drink,etc.

Inquire

Description

Product Description

General Description

It is suitable for filling and capping carbonated beverage such as beer, CSD, etc. It is equipped the advanced device, electrical equipment, and pneumatic control technology. It has the characteristics of filling reposefully, high speed, liquid level control, capping reliably, frequency conversion timing, less material loss. It can be equipped long-distance control system. It is the preferred equipment for the medium beer and beverage plant.

Product Display

Our Company

Company

Zhangjiagang Well Pak Machinery Co., LTD., located in China’s “golden waterway”, at the southern bank of the middle and lower reaches of the Yangtze river in  Zhangjiagang city, Jiangsu province. She is surrounded by Shanghai, Nanjing, Suzhou, Wuxi and other cities ring . Well is the collection research, manufacturing, service as one of the beverage machinery professional manufacturers. Well  puts the main energy into professional technology domain- beverage packaging machinery, upstream and downstream related both beverage packaging equipment research and development. Well aims at the world’s most advanced beverage packaging machinery technology, combined with domestic and foreign advanced beverage packaging machinery technology, adhering to the technical service the customer’s idea, to conduct a comprehensive development research, products has great market competitive advantage.Well  can provide users with: market positioning analysis, process configuration of equipment, personnel training, etc. A set of turnkey engineering and related services.

FAQ

Q: How about the spare parts?
A: We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.

Q: How long time for installation?
A: According your machines order,we will send one or two engineers to your plant for installation, it will take about 10 days to 25 days.

Q: How to install my machines when it arrives? how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines. Customer pay air tickets go and back, accommodation and USD80/day/person.

Q: When can I get my machine after I paid?
A: Normally production time is around 30-60days, the exactly date depend on what kind of machine you order. The shipping time is based on your destination port.

Q: What’s your guarantee or the warranty of the quality if we buy your machines?
A: We offer you high quality machines with 1 year guarantee and supply life-long technical support.

Q: Are you a trading company or a manufacturer?
A: We are an Original Equipment Manufacturer so that we can provide you high quality machines in raeasonable price, Welcome to visit us.

Customers Who Bought This Item Also Bought

Title

Go to Top