Big bottle water bottle machine maker
2. Water treatment system purify water (Sand filter,carbon filter,RO/UF ,Ozone sterilizer,UV sterilizer and etc.)
3. Air conveyor for empty bottle loading
4. Rinser-filler-capper 3 in 1 monoblock
5. Cap loader load caps
6. Code printer (Ink-jet printer/ laser-jet printer)
7. Labeling machine ( PVC sleelve labeling machine/OPP hot melt glue labeling machine/Self-adheisive labeling machine )
8. End packaging ( PE shrink wrapping machine / Carton packing machine )
Product Inquiry
Description
General description
This Machine Series is designed for water filling, like mineral water, still water, pure water etc.
Air conveyor is connected with 3-in-1 monoblock directly. Bottle transport adopts mouth-fixing way. Its advantages:
(1) When user needs to change bottle size but bottle diameter does not change or just changes a little, our machine no need to be adjusted to switch for different bottle size. When bottle diameter changes bigger, it only takes very short time within 10-30minutes to replace change-over parts. It is very convenient for user and saves the cost and time of switching bottle formats.
(2) It avoids second pollution to bottle mouth.
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.
Q2: What is your delivery time?
A2: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.
Q3: How to install my machines when it arrives? How much the cost?
A3: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q4: How long time for installation?
A4: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.
Q5: What is your guarantee?
A5: We have one year guarantee and life-long technical support. Our service also including machine maintence.
Q6: What is your payment term?
A6: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.
Customers Who Bought This Item Also Bought
-
XGF 32-32-10
$14,000.00 -
XGF24-24-8
$14,000.00