Bottled mineral water plant price water filling line

Home » Products » Bottled mineral water plant price water filling line

Bottled mineral water plant price water filling line

Model: XGF14-12-5

Max Speed: 5000BPH(500ml)

Air Pressure: 7Mpa

Air Dosage:  0.8M3/min

 

Inquire

Description

 

General description

This Automatic Wash-filling-capping Water Filling Machine is used to produce bottled mineral water, purified water, flavored water, alcoholic beverage and other non-gas Liquid. This Machine can be applied to all kinds of plastic products such as PET, PE. Bottles size varies from 250ml-2500ml meanwhile few changeover is needed. This series of filling machine capacity varies from 3000BPH to 32000BPH.

Our water filling machine is designed for the low/middle capacity and small factory. It features low water and low electricity consumption, small space occupation as well as easy operation. At the same time It improves the sanitary conditions and simplifies the maintenance compared with the last generation water filling machine. it can perfectly complete the function of automatic washing, filling and capping, which has been aproved by our clients as technical matured and quality product.

Company information

CompanyZhangjiagang Well Pak Machinery Co., LTD., located in China’s “golden waterway”, at the southern bank of the middle and lower reaches of the Yangtze river in Zhangjiagang city, Jiangsu province. She is surrounded by Shanghai, Nanjing, Suzhou, Wuxi and other cities ring. Well is the collection research, manufacturing, service as one of the beverage machinery professional manufacturers. Well puts the main energy into professional technology domain- beverage packaging machinery, upstream and downstream related both beverage packaging equipment research and development. Well aims at the world’s most advanced beverage packaging machinery technology, combined with domestic and foreign advanced beverage packaging machinery technology, adhering to the technical service the customer’s idea, to conduct a comprehensive development research, products has great market competitive advantage.

FAQ

Q: How about the spare parts?
A: We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.

Q: How long time for installation?
A: According your machines order,we will send one or two engineers to your plant for installation, it will take about 10 days to 25 days.

Q: How to install my machines when it arrives? how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines. Customer pay air tickets go and back, accommodation and USD80/day/person.

Q: When can I get my machine after I paid?
A: Normally production time is around 30-60days, the exactly date depend on what kind of machine you order. The shipping time is based on your destination port.

Q: What’s your guarantee or the warranty of the quality if we buy your machines?
A: We offer you high quality machines with 1 year guarantee and supply life-long technical support.

Q: Are you a trading company or a manufacturer?
A: We are an Original Equipment Manufacturer so that we can provide you high quality machines in raeasonable price, Welcome to visit us.

 

 

Customers Who Bought This Item Also Bought

Title

Go to Top