Small bottle filling machine of pure water
Rated Speed: 16000BPH(500ml)
Max Speed:18000BPH(500ml)
Air Pressure: 7Mpa
Air Dosage:0.8M3/min
Rinsing Water Pressure:0.2-0.25Mpa
Rinsing Water Consumption: 2.2T/H
Product Inquiry
Description
General description
This Drink water bottle filling machine / equipment / production line used to produce polyester bottled mineral water, purified water, alcoholic beverage machinery and other non-gas beverage machinery. Beverage Machinery can finish all the process such as washing bottle, filling and sealing, it can reduce the materials and Outsiders touch time, improve the sanitary conditions, production capacity and economic efficiency.
Company information
Zhangjiagang Well Pak Machinery Co., LTD., located in China’s “golden waterway”, at the southern bank of the middle and lower reaches of the Yangtze river in Zhangjiagang city, Jiangsu province. She is surrounded by Shanghai, Nanjing, Suzhou, Wuxi and other cities ring. Well is the collection research, manufacturing, service as one of the beverage machinery professional manufacturers. Well puts the main energy into professional technology domain- beverage packaging machinery, upstream and downstream related both beverage packaging equipment research and development. Well aims at the world’s most advanced beverage packaging machinery technology, combined with domestic and foreign advanced beverage packaging machinery technology, adhering to the technical service the customer’s idea, to conduct a comprehensive development research, products has great market competitive advantage.
FAQ
Q: How about the spare parts?
A: We will send one year enough easy broken spare parts together with the machines, shipping together. During the warranty time, we will supply the spare parts with our cost including the delivery fees.
Q: How long time for installation?
A: According your machines order, we will send one or two engineers to your plant for installation, it will take about 10 days to 25 days.
Q: How to install my machines when it arrives? how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines. Customer pay air tickets go and back, accommodation and USD80/day/person.
Q: When can I get my machine after I paid?
A: Normally production time is around 30-60days, the exactly date depend on what kind of machine you order. The shipping time is based on your destination port.
Q: What’s your guarantee or the warranty of the quality if we buy your machines?
A: We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q: Are you a trading company or a manufacturer?
A: We are an Original Equipment Manufacturer so that we can provide you high quality machines in reasonable price, Welcome to visit us.
Customers Who Bought This Item Also Bought
-
Water Bottling Machine
$14,000.00 -
XGF 18-18-6
$14,000.00